CSA N285.0 Scope of Work

CSA N285.0 Scope of Work

Construction of Class 1, 1C, 2, 2C, 3, 3C, 4 vessels, parts, appurtenances, piping systems, piping sub-assemblies, welded and non-welded supports and shop assembly; for which overall responsibility is retained at the above location and for which fabrication and installation is subcontracted to appropriate Certificate Holders; in accordance with CSA Standard N285.0, General Requirements for Pressure Retaining Systems and Components in CANDU Nuclear Power Plants.

As a material organization supplying ferrous and non-ferrous material including welding material qualification of non-certified material organization, approval and control of suppliers, shipment of material from qualified material organization to parties, other than CNG Nuclear, at the above location only in accordance with CSA N285.0, General Requirements for Pressure Retaining Systems and Components in CANDU Nuclear Power Plants.

The scope of CNG Nuclear Quality Management System (QSM) applies to the delivery of products and services to customers of Canadian Nuclear Global Services Inc. (CNG Nuclear). The requirements of CNG Nuclear Quality Assurance Program apply to all aspects of CNPS work when delivering products and services. CNG Nuclear provides Engineering Services in the areas of design, design analysis, procurement, and supply of pressure retaining materials/components. The scope also includes Engineering and Quality Assurance services for construction, maintenance and operations, training, commissioning and decommissioning services.